Direct Stick Timber Flooring To Concrete

Nowadays this is the more common option and is our preferred method of installation for bamboo flooring.
Direct stick timber flooring to concrete. Hardwood flooring is a good option for a lot of homes. It is vital that any underfloor heating system be fitted with a cut off thermostat set no higher than 22 degrees celsius when measured under the timber flooring. However without any knowledge of its installation it can easily be a nightmare for you. A direct stick floor is a common way to install a timber floor by gluing each individual floorboard directly to the concrete substrate or a timber substrate in older styled homes.
Timber flooring installation method 1. In slab heating uses either electric or hydronic heating elements which are embedded in the slab. This is because when you direct stick flooring it glues your prefinished or engineered timber floor directly to the concrete or chipboard subfloor. Installing hardwood flooring on top of a concrete slab shouldn t be a complicated process.
Note we are discussing timber flooring not laminate flooring all our laminates should be floated. A direct stick refers to the floorboards being glued down directly to the concrete subfloor. Direct stick june 25 2014 installation of each and every solid timber floor is unique and dependent upon several factors including but not limited to the type and location of dwelling substrate characteristics ambient atmospheric conditions choice of timber type of coating whether stairs are included. This is by far the most popular method here in western australia for the fixing of your new timber floor.
Solid timber installation explained. Rapidly becoming the most popular way to install flooring direct stick flooring is the best solution for people who want long lasting flooring that provides a quiet solid flooring feel. If using in slab heating we recommend our direct stick to slab method above. Glue down method the glue down aka direct stuck method involves fixing your floor directly to the substrate using an adhesive.
As the picture suggests a moisture barrier is applied to the concrete slab then the timber is glued and nailed to the concrete.