Do I Need To Lay Basement Floor Before Walls

I want to finish my basement but i need to keep costs as low as possible.
Do i need to lay basement floor before walls. Ultimately the order in which you proceed depends on the. You ll need help with holding the wood together as you start to secure it and you ll need someone to help lift the wall into place. Secure the bottom plate to the basement floor using a powder actuated nail gun. If you re building each section on the floor i highly recommend having someone with you.
Be sure to maintain the 16 inch on center stud spacing and check the wall frame to make sure it s plumb before nailing it to the beam. How alkalis attack a finished basement. However if you install the flooring first you ll need to cover it with plastic sheeting or painter s tarps before you work on the walls. And you only need to fill the gap between the joist and the floor.
Shoot one nail between each pair of studs. Lay the plates in such a way that the treated wood is closer to the concrete wall. Then lay another ordinary plate that will sit right on top of the treated one to form a 2 layered bottom plate. Repeat the previous steps to frame install and secure the next wall.
Can i put this in before he starts the walls or do i need to wait until after. Building new walls inside the existing concrete walls is the standard way of finishing basement walls. Do use wall construction materials designed for basements. If your basement floor is not level which most basement floors aren t building on the floor will be a challenge.
Nobody has given me a good reason why the walls should be built first. On upper floors supported by wooden joists walls are built. Water vapor condenses on cool surfaces sweating walls in the summer or when trapped under a covering and activates the alkalis in concrete. Water carries dissolved alkalis from the concrete and soil.
Floor drains are most often installed during original construction often in the utility area to drain away excess water in the basement.